About this template
A video has a date it needs to go live, and a long chain of decisions before that. The client and the production side each wait on the other, and when it is unclear whose turn it is, the work stops.
This template lays out the whole production as an editable timeline that starts from your publish date, about eight weeks from the brief to the published video.
It assumes a company or product video a few minutes long. The durations are guidelines. A multi-day shoot or heavy animation needs more time for the shoot and the edit.
How the plan is broken down
Decide first. The brief, a concept and an outline, ending with a sign-off. Shooting before the outline is settled leads to reshoots.
Prepare the shoot, then shoot. The script and storyboard are written while cast, location and gear are booked. The shoot day is the hardest date to move, because it depends on people and places.
Edit and revise. A rough cut, one round of consolidated feedback, revisions and a final approval. The thumbnail, title and description are prepared alongside the edit.
Why the durations are set this way
- Outline sign-off is a task of its own. Everything shot and edited later rests on it.
- Booking gets 12 days. Talent calendars, location permission and gear rental all involve waiting for answers.
- Review of the rough cut gets 4 days. That is the time to collect comments and merge them into one list.
- 3 days between delivery and publishing. Room for a last fix and for setting up the upload.
Common pitfalls
- Booking the shoot before the outline is final. If it is not clear what to shoot, you will not get it all on the day.
- Feedback arriving from everyone separately. Name one person who collects comments and sends a single list.
- No limit on revision rounds. Agree on the number in advance, or the edit runs until the publish date.
Who finishes what before the next step starts
Productions usually stall where nobody is sure whose turn it is. For each step, decide who finishes it and what "done" means before you start.
| Step | Who finishes it | Done when |
|---|---|---|
| Brief | Client | The goal, the audience and the budget ceiling fit on one page |
| Concept & outline | Director | The outline is with the client |
| Outline sign-off | Client | Every change request is in, and "we shoot this" is decided |
| Script & storyboard | Director | Every shot is written down |
| Cast, location & gear | Director | People and place are confirmed for the shoot day |
| Shoot | Camera & editor | Every planned shot is captured and the footage is checked |
| Rough cut | Camera & editor | It can be watched from start to finish |
| Review of the rough cut | Client | One consolidated list of changes has been sent |
| Final approval & delivery | Client | "Publish this" is decided and the files are received |
If "done" is written as "check" or "coordinate", nobody can say whether it happened. Write it as something that either happened or did not: "sent", "decided".
If the review runs late, what happens to the publish date
In the second half of this plan, a delay reaches the publish date along one path:
Review of the rough cut → Revisions, color & sound → Final approval & delivery → Publish
The review is planned from day 39 to day 43, final approval from day 50 to day 53, and publishing on day 56. That leaves 3 days of slack before the publish date.
If the review runs 3 days late, final approval ends on day 56, the publish date itself. The date holds, with nothing to spare. If it runs a week late, publishing moves by 4 days.
The thumbnail, title and description are not on this path. They keep moving.
If the publish date cannot move, win the time back in this order:
- Cut the reviewer list and name one person to merge comments. Reviews run late because everyone is waiting for everyone else.
- Do the revisions in one round. Send one list, not a trickle of small notes.
- Do not choose a reshoot. It means rebooking people and places, the slowest option there is. Look for a fix in the edit first.
To keep the review from slipping, settle three things before you start: who reviews, by when they answer, and how many rounds of changes are included.
How to use it
Enter your publish date and click "Start with this template". The whole plan opens as an editable timeline (a Gantt chart), laid out backward from that date. No sign-up, no login. Drag and drop to match your own production.
The member list comes preloaded with a client, a director, camera & editor and talent, so you can assign each step right away. Share the plan with a link so both sides follow the same schedule.