[{"data":1,"prerenderedAt":1353},["ShallowReactive",2],{"free-gantt-about:zh-tw":3,"lp-gantt-templates:zh-tw":1083},{"id":4,"title":5,"body":6,"description":1031,"extension":1075,"locale":1076,"meta":1077,"navigation":1078,"path":1079,"seo":1080,"stem":1081,"__hash__":1082},"freeGantt\u002Fzh-tw\u002Flp\u002Ffree-gantt\u002Fabout.md","About",{"type":7,"value":8,"toc":1030},"minimark",[9,14,18,21,24,27,31,34,37,40,43,47,50,53,56,59,62,65,68,71,74,77,80,83,86,89,92,95,98,101,104,107,110,113,116,119,122,126,192,195,261,264,332,335,398,401,491,494,577,580,672,675,732,735,803,806,885,888,891,894,899,913,917,927,931,941,945,955,958,961,964,968,971,975,978,982,985,989,992,996,999,1003,1006,1010,1013,1017,1020,1023,1027],[10,11,13],"h2",{"id":12},"什麼是-gantt-san免註冊免登入的免費線上甘特圖","什麼是 Gantt-san？免註冊、免登入的免費線上甘特圖",[15,16,17],"p",{},"Gantt-san 就像它的名字一樣，是一款「免登入、人人都能免費使用的線上甘特圖」。不需要註冊帳號、不需要登入，甚至連「開始吧！」按鈕都不用按，就能直接開始製作甘特圖。你看！上面的畫面，現在就能直接操作。正因為這麼方便，第一次使用的人也能輕鬆上手。",[15,19,20],{},"製作好的甘特圖可以儲存成檔案，只要載入已儲存的檔案，隨時都能恢復原狀。而且只要建立分享連結，就能與全世界分享。只要有網路，隨時隨地都能快速製作，也能快速分享給其他人，非常方便。有了這項分享功能，不論是遠距工作還是跨國專案，都能順暢地共享資訊。",[15,22,23],{},"此外，Gantt-san 的介面很簡單，新手也能直覺操作。編輯甘特圖、新增任務、調整時程都很容易，讓專案的進度管理更順暢，工作也能更有效率地推進。例如，用拖放就能變更專案的開始日期和結束日期，這項功能非常方便。另外，利用顏色區分的功能，還能一眼分辨任務的優先度和狀態。",[15,25,26],{},"Gantt-san 也支援近乎即時的協作。團隊成員可以一起編輯同一份甘特圖，即時共享專案進度，更快做出決策。",[10,28,30],{"id":29},"甘特圖到底是什麼","甘特圖到底是什麼？",[15,32,33],{},"甘特圖是一種用於時程管理、類似長條圖的圖表。為了完成一件大事，把構成它的每一項小工作「什麼時候開始、什麼時候之前要完成」以視覺化的方式呈現出來。這樣一來，整體進度一目了然，計畫也更容易調整。",[15,35,36],{},"說得更簡單一點，甘特圖就是把「待辦清單」和「月曆」結合在一起。把待辦事項由上往下一一列出，再在右邊的月曆上標出每件事要在什麼時候完成。如果再加上「由誰負責」「目前是什麼狀態」等資訊，就會更清楚易懂。由此可見，甘特圖是把任務分配和進度視覺化的實用工具。",[15,38,39],{},"甘特圖特別適合用來規劃和管理複雜的專案。透過視覺化管理任務之間的相依關係和資源分配，可以提升整個專案的效率。它也能用來重新檢視任務的優先順序、追蹤進度。例如，在專案初期就把整體時程釐清，便能預見之後可能發生的問題，提早採取對策。",[15,41,42],{},"此外，甘特圖也是促進整個團隊溝通的重要工具。所有專案成員都參照同一份甘特圖，就能建立共同的認知，同心協力推進專案。這樣可以避免誤會和資訊傳達落差，讓專案順利運作。",[10,44,46],{"id":45},"gantt-san-的使用方法甘特圖的製作方式","Gantt-san 的使用方法（甘特圖的製作方式）",[15,48,49],{},"那麼，實際來製作一份甘特圖吧。用 Gantt-san，10 秒就能做出甘特圖。",[15,51,52],{},"首先，建立「待辦清單」。按下「新增任務」按鈕，一一新增任務（要做的事）。這是為了完成一項大工作而拆解出來的小工作清單。任務最好盡量具體、目標明確。用「做某某事」這樣的方式命名，會更清楚。",[15,54,55],{},"想把任務分組時，就建立「子任務」。把滑鼠移到任務上，會出現彈出選單，可以在選單中縮排。縮排後，這項任務就會成為上一項任務的子任務，形成階層結構。",[15,57,58],{},"接著，在月曆上填入每一項「要做的事」從什麼時候做到什麼時候。想像成往右畫出一條橫線。把滑鼠移到月曆上會出現方框，點一下就能放上長條。長條可以用滑鼠移動或拉長，用這種方式畫出工作期間。也試著把任務的長條連起來吧。當某項任務必須等其他任務完成才能進行時，也能清楚標示出這種相依關係。",[15,60,61],{},"點擊任務或長條，就會打開任務的詳細資訊。填入任務的負責人和目前的狀態。一開始沒有可選的負責人，所以先按「+」按鈕，輸入一起做這份工作的夥伴的名字。狀態則填入這項任務目前的情況。變成「Done」就代表完成了。",[15,63,64],{},"這樣就完成了一份誰都能看懂的甘特圖。",[10,66,67],{"id":67},"甘特圖派得上用場的情況",[15,69,70],{},"甘特圖適合用來規劃「做完某件事」。這件要完成的事，就稱為「專案」。專案具有「有開始、有結束」的性質，其中排列著許多可以執行的小單位任務。想讓整個計畫一目了然時，甘特圖就能派上用場。",[15,72,73],{},"當整個計畫一目了然，分工就更容易。可以避免工作過度集中在同一個人身上，也能安排工作在人與人之間交接的順序。仔細確認分工和順序，也有助於檢查有沒有遺漏必要的工作、有沒有多餘的工作。",[15,75,76],{},"定期更新甘特圖中任務的狀態，就能掌握整個專案的情況：是否照計畫進行、是否落後、是否發生了什麼問題。一旦察覺落後或問題，就能著手研擬對策。",[15,78,79],{},"當專案嚴重落後，或需要做出變更、必須從原本的計畫進行調整時，有甘特圖也很方便。不需要重寫一次待辦清單，只要修改需要調整的部分，再重新檢查整體即可。",[15,81,82],{},"此外，甘特圖把專案的進展視覺化，也有提振整個團隊士氣的效果。進度看得見，成員更容易了解自己的角色和進度，也能提升動力。為了讓專案成功，積極善用甘特圖吧。",[10,84,85],{"id":85},"甘特圖不太適用的情況",[15,87,88],{},"比起計畫更需要彈性時，甘特圖可能就不太適合。例如安排「這週怎麼過」，有 10 件事、不論順序什麼時候做都可以，如果每一件都細細設定截止日期、分配負責人、管理狀態，可能就有點把力氣浪費在管理上了。再加上新增工作、因此延後做不完的工作，全部都要在甘特圖上更新，會是很累人的事。遇到這種情況，就需要考慮其他的管理方式。",[15,90,91],{},"這類工作也許更適合一邊按工作群組確認達成度、一邊以速度和彈性為優先，用看板（Kanban）方法等方式來管理。依照每份工作和團隊的性質來選擇專案管理方式，是很重要的。看板方法能一邊將任務進度視覺化、一邊彈性應變，適合變動頻繁的專案。它也是以視覺化方式管理任務、依優先度彈性應對的有效工具。",[15,93,94],{},"另外，甘特圖有時也不適合管理很細的任務。例如，有大量短時間就能完成的任務時，逐一細部管理往往會變得很繁瑣。這時，結合任務管理工具或敏捷方法，有效率地推進專案就很重要。敏捷方法以短期的衝刺（Sprint）管理任務並定期檢討，能彈性地推進專案。",[15,96,97],{},"保持彈性、選擇合適的工具來管理專案，是成功的關鍵。例如在 IT 專案或軟體開發專案中，把敏捷方法和甘特圖結合使用是很常見的做法。這樣能在計畫與執行之間取得平衡，有效率地推進專案。",[10,99,100],{"id":100},"甘特圖的歷史",[15,102,103],{},"甘特圖是在 1910 年代，由美國的機械工程師暨管理顧問亨利·甘特（Henry L. Gantt）所發明。他的目的是讓複雜專案的進度更容易以視覺化方式管理。甘特圖用長條表示每項任務的開始日期和結束日期，清楚呈現整體時程以及各任務之間的相依關係。透過這種視覺化的方式，專案的進展得以一目了然。",[15,105,106],{},"第二次世界大戰期間，甘特圖被用於管理大規模的軍事專案，證明了它的成效。從那時起，甘特圖就被廣泛視為專案管理的標準工具，如今已應用在各種領域。從商業專案到營建專案、製造專案、活動管理等，甘特圖的應用範圍很廣，通用性高正是它的特色。",[15,108,109],{},"此外，隨著甘特圖的演進，也出現了各種數位工具和軟體，讓專案管理更有效率。Gantt-san 就是其中之一，作為一款透過網路隨時隨地都能使用的甘特圖工具，受到許多使用者的青睞。可以說，甘特圖的歷史是和專案管理的演進一路同行的。",[15,111,112],{},"甘特圖也被運用在教育領域。學生把甘特圖當作管理專題的工具，可以學會時間管理和替任務排定優先順序。這能幫助學生養成有效率的工作習慣，對將來的職涯也有幫助。",[15,114,115],{},"甘特圖的普及，大大改變了專案管理的方法。過去靠手工進行的時程管理，因為甘特圖的出現，變得能以視覺化又有效率的方式進行。這項演進提高了專案的成功率，讓更多專案能如期完成。",[10,117,118],{"id":118},"甘特圖的具體範例",[15,120,121],{},"甘特圖被用於規劃和管理各式各樣的專案。以下列出幾個具體範例。這些稱為 WBS（Work Breakdown Structure，工作分解結構），是把大工作拆解成「待辦清單」的結果。實際的專案中，通常還會再拆成更細的任務。透過這些範例，一起了解甘特圖實際的運用方式吧。",[123,124,125],"h3",{"id":125},"軟體開發專案",[127,128,129,145,156,167,181],"ol",{},[130,131,132,133],"li",{},"需求定義\n",[134,135,136,139,142],"ul",{},[130,137,138],{},"需求蒐集",[130,140,141],{},"需求分析",[130,143,144],{},"需求確認",[130,146,147,148],{},"設計\n",[134,149,150,153],{},[130,151,152],{},"系統設計",[130,154,155],{},"詳細設計",[130,157,158,159],{},"實作\n",[134,160,161,164],{},[130,162,163],{},"撰寫程式",[130,165,166],{},"程式碼審查",[130,168,169,170],{},"測試\n",[134,171,172,175,178],{},[130,173,174],{},"單元測試",[130,176,177],{},"整合測試",[130,179,180],{},"系統測試",[130,182,183,184],{},"發布\n",[134,185,186,189],{},[130,187,188],{},"部署準備",[130,190,191],{},"正式環境部署",[123,193,194],{"id":194},"新產品開發的流程管理",[127,196,197,208,219,228,239,250],{},[130,198,199,200],{},"構想發想\n",[134,201,202,205],{},[130,203,204],{},"市場調查",[130,206,207],{},"腦力激盪",[130,209,210,211],{},"概念開發\n",[134,212,213,216],{},[130,214,215],{},"概念設計",[130,217,218],{},"製作原型",[130,220,147,221],{},[134,222,223,225],{},[130,224,155],{},[130,226,227],{},"撰寫產品規格書",[130,229,230,231],{},"生產準備\n",[134,232,233,236],{},[130,234,235],{},"採購物料",[130,237,238],{},"準備生產線",[130,240,241,242],{},"生產\n",[134,243,244,247],{},[130,245,246],{},"試產",[130,248,249],{},"量產",[130,251,252,253],{},"導入市場\n",[134,254,255,258],{},[130,256,257],{},"行銷計畫",[130,259,260],{},"產品上市",[123,262,263],{"id":263},"行銷活動的規劃",[127,265,266,277,288,299,310,321],{},[130,267,268,269],{},"設定活動目標\n",[134,270,271,274],{},[130,272,273],{},"設定目標",[130,275,276],{},"定義 KPI",[130,278,279,280],{},"市場調查\n",[134,281,282,285],{},[130,283,284],{},"目標市場分析",[130,286,287],{},"競爭對手分析",[130,289,290,291],{},"活動企劃\n",[134,292,293,296],{},[130,294,295],{},"訊息開發",[130,297,298],{},"創意製作",[130,300,301,302],{},"媒體規劃\n",[134,303,304,307],{},[130,305,306],{},"選定媒體",[130,308,309],{},"購買廣告版位",[130,311,312,313],{},"執行\n",[134,314,315,318],{},[130,316,317],{},"投放廣告",[130,319,320],{},"經營社群媒體",[130,322,323,324],{},"評估\n",[134,325,326,329],{},[130,327,328],{},"蒐集資料",[130,330,331],{},"成效評估",[123,333,334],{"id":334},"建築工程的進度管理",[127,336,337,348,359,376,387],{},[130,338,339,340],{},"設計階段\n",[134,341,342,345],{},[130,343,344],{},"基本設計",[130,346,347],{},"細部設計",[130,349,350,351],{},"準備階段\n",[134,352,353,356],{},[130,354,355],{},"取得許可",[130,357,358],{},"施工計畫",[130,360,361,362],{},"施工階段\n",[134,363,364,367,370,373],{},[130,365,366],{},"整地",[130,368,369],{},"基礎工程",[130,371,372],{},"結構工程",[130,374,375],{},"裝修工程",[130,377,378,379],{},"交屋階段\n",[134,380,381,384],{},[130,382,383],{},"最終驗收",[130,385,386],{},"交屋",[130,388,389,390],{},"售後服務階段\n",[134,391,392,395],{},[130,393,394],{},"保固期間管理",[130,396,397],{},"維護保養",[123,399,400],{"id":400},"研討會的準備時程",[127,402,403,414,425,436,447,458,469,480],{},[130,404,405,406],{},"決定主題\n",[134,407,408,411],{},[130,409,410],{},"選定目標對象",[130,412,413],{},"設定主題",[130,415,416,417],{},"選定講者\n",[134,418,419,422],{},[130,420,421],{},"列出講者名單",[130,423,424],{},"與講者洽談",[130,426,427,428],{},"場地準備\n",[134,429,430,433],{},[130,431,432],{},"選定場地",[130,434,435],{},"預約場地",[130,437,438,439],{},"宣傳活動\n",[134,440,441,444],{},[130,442,443],{},"製作網站",[130,445,446],{},"製作宣傳資料",[130,448,449,450],{},"招募參加者\n",[134,451,452,455],{},[130,453,454],{},"開始招募",[130,456,457],{},"管理參加者",[130,459,460,461],{},"執行準備\n",[134,462,463,466],{},[130,464,465],{},"準備資料",[130,467,468],{},"彩排",[130,470,471,472],{},"當天營運\n",[134,473,474,477],{},[130,475,476],{},"報到接待",[130,478,479],{},"研討會進行",[130,481,482,483],{},"會後追蹤\n",[134,484,485,488],{},[130,486,487],{},"回收問卷",[130,489,490],{},"後續追蹤",[123,492,493],{"id":493},"婚禮的規劃",[127,495,496,505,516,527,538,549,557,567],{},[130,497,350,498],{},[134,499,500,503],{},[130,501,502],{},"決定日期",[130,504,432],{},[130,506,507,508],{},"製作賓客名單\n",[134,509,510,513],{},[130,511,512],{},"製作賓客名單",[130,514,515],{},"寄送喜帖",[130,517,518,519],{},"挑選服裝\n",[134,520,521,524],{},[130,522,523],{},"挑選婚紗",[130,525,526],{},"挑選西裝",[130,528,529,530],{},"婚禮儀式準備\n",[134,531,532,535],{},[130,533,534],{},"擬定儀式流程",[130,536,537],{},"準備誓詞",[130,539,540,541],{},"喜宴準備\n",[134,542,543,546],{},[130,544,545],{},"選定菜單",[130,547,548],{},"製作座位表",[130,550,551,552],{},"彩排\n",[134,553,554],{},[130,555,556],{},"進行彩排",[130,558,471,559],{},[134,560,561,564],{},[130,562,563],{},"儀式進行",[130,565,566],{},"喜宴進行",[130,568,482,569],{},[134,570,571,574],{},[130,572,573],{},"寄送謝卡",[130,575,576],{},"製作相簿",[123,578,579],{"id":579},"暑假的安排",[127,581,582,592,603,617,628,639,650,661],{},[130,583,584,585],{},"計畫準備\n",[134,586,587,590],{},[130,588,589],{},"確認日程",[130,591,273],{},[130,593,594,595],{},"學習活動\n",[134,596,597,600],{},[130,598,599],{},"管理暑假作業進度",[130,601,602],{},"讀完指定書目",[130,604,605,606],{},"休閒活動\n",[134,607,608,611,614],{},[130,609,610],{},"去海邊玩水",[130,612,613],{},"露營",[130,615,616],{},"游泳池",[130,618,619,620],{},"運動\n",[134,621,622,625],{},[130,623,624],{},"游泳練習",[130,626,627],{},"騎腳踏車",[130,629,630,631],{},"家庭時光\n",[134,632,633,636],{},[130,634,635],{},"拜訪親戚",[130,637,638],{},"家庭旅行",[130,640,641,642],{},"特別活動\n",[134,643,644,647],{},[130,645,646],{},"參加夏日祭典",[130,648,649],{},"煙火大會",[130,651,652,653],{},"自我成長\n",[134,654,655,658],{},[130,656,657],{},"學習新嗜好",[130,659,660],{},"上線上課程",[130,662,663,664],{},"放鬆充電\n",[134,665,666,669],{},[130,667,668],{},"休息與放鬆",[130,670,671],{},"健康管理",[123,673,674],{"id":674},"產品出貨的時間表",[127,676,677,688,699,710,721],{},[130,678,679,680],{},"產品完成\n",[134,681,682,685],{},[130,683,684],{},"品質檢驗",[130,686,687],{},"包裝準備",[130,689,690,691],{},"出貨準備\n",[134,692,693,696],{},[130,694,695],{},"製作出貨指示單",[130,697,698],{},"貼標籤",[130,700,701,702],{},"安排運輸\n",[134,703,704,707],{},[130,705,706],{},"選定物流業者",[130,708,709],{},"調整運輸時程",[130,711,712,713],{},"出貨\n",[134,714,715,718],{},[130,716,717],{},"產品出庫",[130,719,720],{},"提供追蹤資訊",[130,722,723,724],{},"配送\n",[134,725,726,729],{},[130,727,728],{},"確認送達",[130,730,731],{},"通知客戶",[123,733,734],{"id":734},"搬家到東京的計畫",[127,736,737,748,759,770,781,792],{},[130,738,739,740],{},"整理目前的住處\n",[134,741,742,745],{},[130,743,744],{},"整理不需要的物品",[130,746,747],{},"打包",[130,749,750,751],{},"準備新住處\n",[134,752,753,756],{},[130,754,755],{},"找房子",[130,757,758],{},"簽約手續",[130,760,761,762],{},"選定搬家公司\n",[134,763,764,767],{},[130,765,766],{},"選定業者",[130,768,769],{},"調整搬家日期",[130,771,772,773],{},"搬家\n",[134,774,775,778],{},[130,776,777],{},"搬出行李",[130,779,780],{},"移動",[130,782,783,784],{},"在新住處安頓\n",[134,785,786,789],{},[130,787,788],{},"搬入行李",[130,790,791],{},"擺放家具",[130,793,794,795],{},"變更地址手續\n",[134,796,797,800],{},[130,798,799],{},"到公所辦理遷移登記",[130,801,802],{},"變更各項地址",[123,804,805],{"id":805},"大學入學考試的上榜計畫",[127,807,808,819,830,841,852,863,874],{},[130,809,810,811],{},"設定目標\n",[134,812,813,816],{},[130,814,815],{},"選定志願學校",[130,817,818],{},"設定上榜目標",[130,820,821,822],{},"讀書計畫\n",[134,823,824,827],{},[130,825,826],{},"製作讀書時程表",[130,828,829],{},"選定教材",[130,831,832,833],{},"模擬考對策\n",[134,834,835,838],{},[130,836,837],{},"參加模擬考",[130,839,840],{},"分析結果",[130,842,843,844],{},"加強弱點\n",[134,845,846,849],{},[130,847,848],{},"弱科對策",[130,850,851],{},"上家教課",[130,853,854,855],{},"報名準備\n",[134,856,857,860],{},[130,858,859],{},"準備報名資料",[130,861,862],{},"辦理報名手續",[130,864,865,866],{},"考前衝刺\n",[134,867,868,871],{},[130,869,870],{},"練習歷屆試題",[130,872,873],{},"模擬考試流程",[130,875,876,877],{},"正式考試\n",[134,878,879,882],{},[130,880,881],{},"身體狀況管理",[130,883,884],{},"考試當天準備",[10,886,887],{"id":887},"甘特圖的疑難排解",[15,889,890],{},"製作甘特圖時，可能會遇到一些常見的問題。以下說明這些問題和對應的方法。事先了解這些方法，就能讓專案管理發揮最大的效果。",[123,892,893],{"id":893},"問題範例與對應方法",[895,896,898],"h4",{"id":897},"_1-任務延遲","1. 任務延遲",[15,900,901,905,906,909,912],{},[902,903,904],"strong",{},"問題："," 任務進度比預定落後。",[907,908],"br",{},[902,910,911],{},"對應方法："," 重新檢視任務的優先順序，重新分配資源。同時分析延遲的原因，採取防止再發生的對策。必要時調整任務的時程，即時確認進度。",[895,914,916],{"id":915},"_2-任務之間的相依關係問題","2. 任務之間的相依關係問題",[15,918,919,921,922,924,926],{},[902,920,904],{}," 任務之間的相依關係不明確。",[907,923],{},[902,925,911],{}," 釐清每項任務的相依關係，並反映在甘特圖上。適當調整任務的順序。徹底管理相依關係，掌握整個專案的流程。",[895,928,930],{"id":929},"_3-資源過度分配","3. 資源過度分配",[15,932,933,935,936,938,940],{},[902,934,904],{}," 某項資源被分配了過多的任務。",[907,937],{},[902,939,911],{}," 重新檢視資源的使用情況，平均地重新分配任務。必要時確保額外的資源。最佳化資源管理，讓專案有效率地運作。",[895,942,944],{"id":943},"_4-時程的重新檢視","4. 時程的重新檢視",[15,946,947,949,950,952,954],{},[902,948,904],{}," 需要依專案的進展重新檢視時程。",[907,951],{},[902,953,911],{}," 定期更新甘特圖，反映進度。與團隊溝通，分享變更的內容。持續進行時程管理，彈性應變。",[10,956,957],{"id":957},"甘特圖的專業術語集",[15,959,960],{},"製作和使用甘特圖時，了解一些專業術語很重要。以下列出主要的術語。了解這些術語，就能更有效地運用甘特圖。",[123,962,963],{"id":963},"術語一覽",[895,965,967],{"id":966},"_1-任務-task","1. 任務 (Task)",[15,969,970],{},"在專案中執行的個別工作或活動。每項任務都有具體、可達成的目標，構成專案的一部分。",[895,972,974],{"id":973},"_2-里程碑-milestone","2. 里程碑 (Milestone)",[15,976,977],{},"重要的節點或作為目標的時間點，是評估專案進度的基準。設定里程碑，可以讓專案的重要節點更明確。",[895,979,981],{"id":980},"_3-相依關係-dependency","3. 相依關係 (Dependency)",[15,983,984],{},"某項任務依賴其他任務的狀態。相依關係有「完成—開始」「開始—開始」「完成—完成」「開始—完成」4 種。理解並妥善管理這些關係，能讓專案的流程更順暢。",[895,986,988],{"id":987},"_4-要徑-critical-path","4. 要徑 (Critical Path)",[15,990,991],{},"完成專案所需時間最長的一連串任務。要徑上的任務一旦延遲，就會影響整個專案的時程。找出並管理要徑非常重要。",[895,993,995],{"id":994},"_5-寬裕時間-slack-time","5. 寬裕時間 (Slack Time)",[15,997,998],{},"任務延遲也不會影響整個專案時程的緩衝時間。可以利用寬裕時間來進行風險管理。",[895,1000,1002],{"id":1001},"_6-甘特圖-gantt-chart","6. 甘特圖 (Gantt Chart)",[15,1004,1005],{},"以視覺化方式呈現任務時程與進度的圖表。縱軸是任務、橫軸是時間，用長條表示任務的開始日期和結束日期。甘特圖是以視覺化方式掌握整個專案計畫的重要工具。",[895,1007,1009],{"id":1008},"_7-wbs-work-breakdown-structure","7. WBS (Work Breakdown Structure)",[15,1011,1012],{},"為了方便管理而把專案細分的階層式任務結構，讓專案的全貌更容易掌握。善用 WBS，就能更輕鬆地擬定詳細的專案計畫。",[895,1014,1016],{"id":1015},"_8-資源-resource","8. 資源 (Resource)",[15,1018,1019],{},"執行專案所需的人力、設備、材料等。妥善管理資源是專案成功不可或缺的一環。最佳化資源分配，讓專案有效率地運作。",[15,1021,1022],{},"理解並妥善運用這些專業術語，就能更有效地用甘特圖管理專案。以視覺化方式掌握每項任務的進度，及早發現計畫的偏差並因應。特別是在複雜的專案中，善用甘特圖就能在不迷失整體流程的情況下管理進展。",[10,1024,1026],{"id":1025},"用-gantt-san輕鬆善用甘特圖","用 Gantt-san，輕鬆善用甘特圖",[15,1028,1029],{},"我們從甘特圖的使用方法、歷史，一路看到了具體範例。甘特圖在專案管理和時程管理上是非常實用的工具。用 Gantt-san，不需要註冊帳號或登入，就能馬上開始製作甘特圖。參考這些具體範例，現在就來製作屬於你自己的甘特圖吧。",{"title":1031,"searchDepth":1032,"depth":1033,"links":1034},"",2,3,[1035,1036,1037,1038,1039,1040,1041,1053,1062,1074],{"id":12,"depth":1032,"text":13},{"id":29,"depth":1032,"text":30},{"id":45,"depth":1032,"text":46},{"id":67,"depth":1032,"text":67},{"id":85,"depth":1032,"text":85},{"id":100,"depth":1032,"text":100},{"id":118,"depth":1032,"text":118,"children":1042},[1043,1044,1045,1046,1047,1048,1049,1050,1051,1052],{"id":125,"depth":1033,"text":125},{"id":194,"depth":1033,"text":194},{"id":263,"depth":1033,"text":263},{"id":334,"depth":1033,"text":334},{"id":400,"depth":1033,"text":400},{"id":493,"depth":1033,"text":493},{"id":579,"depth":1033,"text":579},{"id":674,"depth":1033,"text":674},{"id":734,"depth":1033,"text":734},{"id":805,"depth":1033,"text":805},{"id":887,"depth":1032,"text":887,"children":1054},[1055],{"id":893,"depth":1033,"text":893,"children":1056},[1057,1059,1060,1061],{"id":897,"depth":1058,"text":898},4,{"id":915,"depth":1058,"text":916},{"id":929,"depth":1058,"text":930},{"id":943,"depth":1058,"text":944},{"id":957,"depth":1032,"text":957,"children":1063},[1064],{"id":963,"depth":1033,"text":963,"children":1065},[1066,1067,1068,1069,1070,1071,1072,1073],{"id":966,"depth":1058,"text":967},{"id":973,"depth":1058,"text":974},{"id":980,"depth":1058,"text":981},{"id":987,"depth":1058,"text":988},{"id":994,"depth":1058,"text":995},{"id":1001,"depth":1058,"text":1002},{"id":1008,"depth":1058,"text":1009},{"id":1015,"depth":1058,"text":1016},{"id":1025,"depth":1032,"text":1026},"md","zh-tw",{},true,"\u002Fzh-tw\u002Flp\u002Ffree-gantt\u002Fabout",{"description":1031},"zh-tw\u002Flp\u002Ffree-gantt\u002Fabout","Q6OeuvTVB2QTTU9ZiT_PrWBo_UYAjTfIytG9YK0BgnE",[1084,1129,1182,1229,1277,1307],{"title":1085,"path":1086,"template":1087},"求職計畫時程表：在職找工作的 3 個月安排（免費範本）","\u002Fzh-tw\u002Fgantt\u002Ftemplates\u002Fjob-search",{"version":1088,"name":1089,"anchor-day":1090,"date-label":1091,"members":1092,"tasks":1095},1,"求職計畫",0,"開始求職的日期",[1093,1094],"自己","獵頭顧問",[1096,1099,1103,1105,1107,1111,1114,1116,1119,1123,1126],{"name":1097,"start":1090,"duration":1098},"自我分析、盤點工作經歷",10,{"name":1100,"start":1101,"duration":1102},"研究產業與公司、蒐集職缺",7,14,{"name":1104,"start":1098,"duration":1098},"撰寫履歷與自傳",{"name":1106,"start":1102,"duration":1101},"更新求職平台資料、與獵頭面談",{"name":1108,"start":1109,"duration":1110},"投遞履歷（應徵）",21,30,{"name":1112,"start":1113,"duration":1109},"等待書面審核",28,{"name":1115,"start":1113,"duration":1102},"面試準備（模擬問答、研究公司）",{"name":1117,"start":1118,"duration":1113},"面試（初試～最終面試）",42,{"name":1120,"start":1121,"duration":1101,"color":1122},"錄取、薪資與條件協商",70,"#F44336",{"name":1124,"start":1125,"duration":1109},"提出離職、工作交接（現職）",75,{"name":1127,"start":1128,"duration":1102},"到職準備、備齊報到文件",84,{"title":1130,"path":1131,"template":1132},"搬家流程怎麼排？8 週搬家流程表與待辦清單｜免費甘特圖範本","\u002Fzh-tw\u002Fgantt\u002Ftemplates\u002Fmoving",{"version":1088,"name":1133,"anchor-day":1134,"date-label":1135,"members":1136,"tasks":1139},"搬家",50,"預定搬家日",[1093,1137,1138],"伴侶","家人",[1140,1142,1144,1147,1149,1151,1154,1158,1161,1163,1165,1168,1171,1173,1176,1179],{"name":1141,"start":1090,"duration":1102},"找房、看房",{"name":1143,"start":1102,"duration":1101},"與房東議價、確認租約內容",{"name":1145,"start":1109,"duration":1146},"簽約、支付押金與第一個月租金",5,{"name":1148,"start":1109,"duration":1101},"搬家公司估價與預約（自己搬就借車、找人手）",{"name":1150,"start":1109,"duration":1088,"color":1122},"通知現在的房東退租",{"name":1152,"start":1153,"duration":1102},"處理不需要的物品（二手轉賣、捐贈、回收）",25,{"name":1155,"start":1156,"duration":1157},"打包（從不常用的東西開始）",32,18,{"name":1159,"start":1160,"duration":1098},"網路移機或新申請",35,{"name":1162,"start":1118,"duration":1033},"確認新舊住處的搬運規定（電梯預約、停車）",{"name":1164,"start":1118,"duration":1146},"水、電、瓦斯的停用、啟用或過戶",{"name":1166,"start":1167,"duration":1032},"申請郵件改寄",45,{"name":1169,"start":1170,"duration":1088},"前一天的最後打包",49,{"name":1172,"start":1134,"duration":1088,"color":1122},"搬家當天",{"name":1174,"start":1175,"duration":1101},"拆箱、擺放家具",51,{"name":1177,"start":1178,"duration":1146},"戶籍遷入（如需要）、證件與帳戶的地址變更",52,{"name":1180,"start":1181,"duration":1088},"舊居點交、歸還鑰匙、退押金",53,{"title":1183,"path":1184,"template":1185},"Onboarding 流程怎麼規劃？新人到職第一個月的訓練時程表範本","\u002Fzh-tw\u002Fgantt\u002Ftemplates\u002Fonboarding",{"version":1088,"name":1186,"anchor-day":1102,"date-label":1187,"members":1188,"tasks":1193},"新人到職訓練","到職日",[1189,1190,1191,1192],"人資／教育訓練負責人","帶領前輩（導師）","所屬部門主管","新進員工",[1194,1196,1198,1200,1202,1205,1207,1209,1212,1215,1218,1220,1223,1226],{"name":1195,"start":1090,"duration":1098},"到職前準備（電腦、帳號、用品）",{"name":1197,"start":1090,"duration":1101},"確定訓練課程、安排講師",{"name":1199,"start":1033,"duration":1058},"決定帶領前輩（導師）並事先說明",{"name":1201,"start":1102,"duration":1088,"color":1122},"到職日報到與新人說明會",{"name":1203,"start":1204,"duration":1033},"認識公司（理念、事業、組織）",15,{"name":1206,"start":1157,"duration":1033},"職場禮儀與法遵訓練",{"name":1208,"start":1109,"duration":1033},"工作工具與公司規定訓練",{"name":1210,"start":1211,"duration":1146},"產品與服務訓練",24,{"name":1213,"start":1204,"duration":1214},"導師 1 對 1 面談（每週）",27,{"name":1216,"start":1217,"duration":1098},"部門 OJT（跟著實際工作）",29,{"name":1219,"start":1113,"duration":1088,"color":1122},"期中回顧面談",{"name":1221,"start":1222,"duration":1033},"訓練心得報告與理解度確認",36,{"name":1224,"start":1225,"duration":1032},"分派面談、確定所屬部門",39,{"name":1227,"start":1228,"duration":1032},"回顧整體訓練並記下下次的改善點",41,{"title":1230,"path":1231,"template":1232},"裝潢流程與時間一次看懂｜約 3.5 個月的裝潢時程表，免註冊直接用","\u002Fzh-tw\u002Fgantt\u002Ftemplates\u002Frenovation",{"version":1088,"name":1233,"anchor-day":1090,"date-label":1234,"members":1235,"tasks":1239},"裝潢","開始考慮的日期",[1236,1237,1238],"屋主（自己）","設計師／統包","工班",[1240,1242,1244,1246,1248,1250,1252,1255,1258,1260,1263,1265,1269,1272,1274],{"name":1241,"start":1090,"duration":1102},"蒐集資料、整理想要的樣子（案例、預算）",{"name":1243,"start":1098,"duration":1102},"比較設計公司／統包、詢問",{"name":1245,"start":1109,"duration":1101},"現場丈量、討論需求",{"name":1247,"start":1113,"duration":1102},"收到平面配置與報價",{"name":1249,"start":1118,"duration":1098},"比較報價、確定材料與規格",{"name":1251,"start":1178,"duration":1033,"color":1122},"簽約",{"name":1253,"start":1254,"duration":1101},"最終確認（顏色、設備、細節）",55,{"name":1256,"start":1257,"duration":1109},"訂購建材與設備、等待交貨",62,{"name":1259,"start":1125,"duration":1033},"向管委會申請施工、通知鄰居",{"name":1261,"start":1262,"duration":1088,"color":1122},"開工",78,{"name":1264,"start":1262,"duration":1146},"拆除、清運",{"name":1266,"start":1267,"duration":1268},"施工（水電、泥作、木作、油漆、設備）",83,20,{"name":1270,"start":1271,"duration":1033},"屋主驗收（現場確認、提出修改）",103,{"name":386,"start":1273,"duration":1088,"color":1122},106,{"name":1275,"start":1276,"duration":1102},"保固期檢查、回報問題",107,{"title":1278,"path":1279,"template":1280},"馬拉松訓練計畫｜從比賽日倒推的 16 週課表，免費線上編輯","\u002Fzh-tw\u002Fgantt\u002Ftemplates\u002Fmarathon-training",{"version":1088,"name":1281,"anchor-day":1282,"date-label":1283,"members":1284,"tasks":1285},"馬拉松訓練",111,"比賽當天",[1093],[1286,1288,1290,1292,1294,1296,1300,1303,1304],{"name":1287,"start":1090,"duration":1113},"打底期（輕鬆跑建立基礎）",{"name":1289,"start":1109,"duration":1118},"拉長距離（LSD、長距離跑）",{"name":1291,"start":1118,"duration":1118},"速度訓練（節奏跑、間歇跑）",{"name":1293,"start":1121,"duration":1109},"30 公里等模擬比賽的長距離跑",{"name":1295,"start":1128,"duration":1102},"高峰期（訓練量最大）",{"name":1297,"start":1298,"duration":1299},"賽前減量（降低訓練量調整狀態）",98,11,{"name":1301,"start":1302,"duration":1088},"賽前一天（準備裝備、補充碳水）",110,{"name":1283,"start":1282,"duration":1088,"color":1122},{"name":1305,"start":1306,"duration":1101},"賽後恢復（積極休息）",112,{"title":1308,"path":1309,"template":1310},"網站改版時程怎麼抓？4 個月的專案時程表範本與進行步驟","\u002Fzh-tw\u002Fgantt\u002Ftemplates\u002Fwebsite-redesign",{"version":1088,"name":1311,"anchor-day":1090,"date-label":1312,"members":1313,"tasks":1317},"網站改版","開始日期",[1314,1315,1316],"內部負責人","網站設計公司","主管／決策者",[1318,1320,1322,1324,1326,1328,1330,1333,1335,1338,1341,1344,1347,1350],{"name":1319,"start":1090,"duration":1098},"整理目的與需求（現況分析、KPI）",{"name":1321,"start":1098,"duration":1268},"撰寫 RFP、選擇網站設計公司",{"name":1323,"start":1110,"duration":1146,"color":1122},"啟動會議、對齊需求",{"name":1325,"start":1160,"duration":1101},"網站架構（Sitemap）設計",{"name":1327,"start":1118,"duration":1098},"製作 Wireframe",{"name":1329,"start":1178,"duration":1204},"視覺設計",{"name":1331,"start":1332,"duration":1101,"color":1122},"確認設計、內部核准",67,{"name":1334,"start":1134,"duration":1153},"撰寫文案、準備內容",{"name":1336,"start":1337,"duration":1153},"切版開發、建置 CMS",74,{"name":1339,"start":1340,"duration":1098},"SEO 準備（301 轉址規劃、Meta 資訊）",85,{"name":1342,"start":1343,"duration":1098},"測試、各種裝置的確認",99,{"name":1345,"start":1346,"duration":1101},"內部最終確認（驗收）",109,{"name":1348,"start":1349,"duration":1032,"color":1122},"上線（切換網域、套用轉址）",116,{"name":1351,"start":1352,"duration":1102},"上線後確認、修正問題",118,1795520207998]