[{"data":1,"prerenderedAt":377},["ShallowReactive",2],{"doc:\u002Fgantt\u002Ftemplates\u002Fvideo-production":3},{"doc":4,"missing":371},{"id":5,"title":6,"body":7,"category":302,"description":303,"extension":304,"locale":305,"meta":306,"navigation":307,"order":308,"path":309,"seo":310,"stem":324,"summary":325,"template":326,"__hash__":370},"ganttTemplates\u002Fgantt\u002Ftemplates\u002Fvideo-production.md","Video Production Timeline Template (Free): Brief to Publish in 8 Weeks",{"type":8,"value":9,"toc":290},"minimark",[10,15,19,22,25,29,36,46,52,56,84,88,109,113,116,232,235,239,242,245,248,251,254,257,277,280,284,287],[11,12,14],"h2",{"id":13},"about-this-template","About this template",[16,17,18],"p",{},"A video has a date it needs to go live, and a long chain of decisions before that. The client and the production side each wait on the other, and when it is unclear whose turn it is, the work stops.",[16,20,21],{},"This template lays out the whole production as an editable timeline that starts from your publish date, about eight weeks from the brief to the published video.",[16,23,24],{},"It assumes a company or product video a few minutes long. The durations are guidelines. A multi-day shoot or heavy animation needs more time for the shoot and the edit.",[11,26,28],{"id":27},"how-the-plan-is-broken-down","How the plan is broken down",[16,30,31,35],{},[32,33,34],"strong",{},"Decide first."," The brief, a concept and an outline, ending with a sign-off. Shooting before the outline is settled leads to reshoots.",[16,37,38,41,42,45],{},[32,39,40],{},"Prepare the shoot, then shoot."," The script and storyboard are written while cast, location and gear are booked. ",[32,43,44],{},"The shoot day is the hardest date to move,"," because it depends on people and places.",[16,47,48,51],{},[32,49,50],{},"Edit and revise."," A rough cut, one round of consolidated feedback, revisions and a final approval. The thumbnail, title and description are prepared alongside the edit.",[11,53,55],{"id":54},"why-the-durations-are-set-this-way","Why the durations are set this way",[57,58,59,66,72,78],"ul",{},[60,61,62,65],"li",{},[32,63,64],{},"Outline sign-off is a task of its own."," Everything shot and edited later rests on it.",[60,67,68,71],{},[32,69,70],{},"Booking gets 12 days."," Talent calendars, location permission and gear rental all involve waiting for answers.",[60,73,74,77],{},[32,75,76],{},"Review of the rough cut gets 4 days."," That is the time to collect comments and merge them into one list.",[60,79,80,83],{},[32,81,82],{},"3 days between delivery and publishing."," Room for a last fix and for setting up the upload.",[11,85,87],{"id":86},"common-pitfalls","Common pitfalls",[89,90,91,97,103],"ol",{},[60,92,93,96],{},[32,94,95],{},"Booking the shoot before the outline is final."," If it is not clear what to shoot, you will not get it all on the day.",[60,98,99,102],{},[32,100,101],{},"Feedback arriving from everyone separately."," Name one person who collects comments and sends a single list.",[60,104,105,108],{},[32,106,107],{},"No limit on revision rounds."," Agree on the number in advance, or the edit runs until the publish date.",[11,110,112],{"id":111},"who-finishes-what-before-the-next-step-starts","Who finishes what before the next step starts",[16,114,115],{},"Productions usually stall where nobody is sure whose turn it is. For each step, decide who finishes it and what \"done\" means before you start.",[117,118,119,135],"table",{},[120,121,122],"thead",{},[123,124,125,129,132],"tr",{},[126,127,128],"th",{},"Step",[126,130,131],{},"Who finishes it",[126,133,134],{},"Done when",[136,137,138,150,161,171,181,191,202,212,222],"tbody",{},[123,139,140,144,147],{},[141,142,143],"td",{},"Brief",[141,145,146],{},"Client",[141,148,149],{},"The goal, the audience and the budget ceiling fit on one page",[123,151,152,155,158],{},[141,153,154],{},"Concept & outline",[141,156,157],{},"Director",[141,159,160],{},"The outline is with the client",[123,162,163,166,168],{},[141,164,165],{},"Outline sign-off",[141,167,146],{},[141,169,170],{},"Every change request is in, and \"we shoot this\" is decided",[123,172,173,176,178],{},[141,174,175],{},"Script & storyboard",[141,177,157],{},[141,179,180],{},"Every shot is written down",[123,182,183,186,188],{},[141,184,185],{},"Cast, location & gear",[141,187,157],{},[141,189,190],{},"People and place are confirmed for the shoot day",[123,192,193,196,199],{},[141,194,195],{},"Shoot",[141,197,198],{},"Camera & editor",[141,200,201],{},"Every planned shot is captured and the footage is checked",[123,203,204,207,209],{},[141,205,206],{},"Rough cut",[141,208,198],{},[141,210,211],{},"It can be watched from start to finish",[123,213,214,217,219],{},[141,215,216],{},"Review of the rough cut",[141,218,146],{},[141,220,221],{},"One consolidated list of changes has been sent",[123,223,224,227,229],{},[141,225,226],{},"Final approval & delivery",[141,228,146],{},[141,230,231],{},"\"Publish this\" is decided and the files are received",[16,233,234],{},"If \"done\" is written as \"check\" or \"coordinate\", nobody can say whether it happened. Write it as something that either happened or did not: \"sent\", \"decided\".",[11,236,238],{"id":237},"if-the-review-runs-late-what-happens-to-the-publish-date","If the review runs late, what happens to the publish date",[16,240,241],{},"In the second half of this plan, a delay reaches the publish date along one path:",[16,243,244],{},"Review of the rough cut → Revisions, color & sound → Final approval & delivery → Publish",[16,246,247],{},"The review is planned from day 39 to day 43, final approval from day 50 to day 53, and publishing on day 56. That leaves 3 days of slack before the publish date.",[16,249,250],{},"If the review runs 3 days late, final approval ends on day 56, the publish date itself. The date holds, with nothing to spare. If it runs a week late, publishing moves by 4 days.",[16,252,253],{},"The thumbnail, title and description are not on this path. They keep moving.",[16,255,256],{},"If the publish date cannot move, win the time back in this order:",[89,258,259,265,271],{},[60,260,261,264],{},[32,262,263],{},"Cut the reviewer list and name one person to merge comments."," Reviews run late because everyone is waiting for everyone else.",[60,266,267,270],{},[32,268,269],{},"Do the revisions in one round."," Send one list, not a trickle of small notes.",[60,272,273,276],{},[32,274,275],{},"Do not choose a reshoot."," It means rebooking people and places, the slowest option there is. Look for a fix in the edit first.",[16,278,279],{},"To keep the review from slipping, settle three things before you start: who reviews, by when they answer, and how many rounds of changes are included.",[11,281,283],{"id":282},"how-to-use-it","How to use it",[16,285,286],{},"Enter your publish date and click \"Start with this template\". The whole plan opens as an editable timeline (a Gantt chart), laid out backward from that date. No sign-up, no login. Drag and drop to match your own production.",[16,288,289],{},"The member list comes preloaded with a client, a director, camera & editor and talent, so you can assign each step right away. Share the plan with a link so both sides follow the same schedule.",{"title":291,"searchDepth":292,"depth":293,"links":294},"",2,3,[295,296,297,298,299,300,301],{"id":13,"depth":292,"text":14},{"id":27,"depth":292,"text":28},{"id":54,"depth":292,"text":55},{"id":86,"depth":292,"text":87},{"id":111,"depth":292,"text":112},{"id":237,"depth":292,"text":238},{"id":282,"depth":292,"text":283},"business","A free video production timeline that works backward from your publish date: brief, outline sign-off, script, casting and locations, the shoot, the edit, review rounds and delivery. No sign-up required.","md","en",{},true,23,"\u002Fgantt\u002Ftemplates\u002Fvideo-production",{"persona":311,"target-query":312,"sub-queries":313,"avoid-queries":316,"vocabulary":319,"title":6,"description":303},"A marketer commissioning a company or product video, or the producer making it, who needs one schedule both sides can follow","video production timeline template",[314,315],"video production schedule template","video production plan template",[317,318],"video editing software","video production cost",[320,321,322,323],"brief","storyboard","call sheet","rough cut","gantt\u002Ftemplates\u002Fvideo-production","Eight weeks from the brief to the published video, laid out backward from the publish date.",{"version":327,"name":328,"anchor-day":329,"date-label":330,"members":331,"tasks":333},1,"Video Production",56,"Publish date",[146,157,198,332],"On-screen talent",[334,338,340,343,346,348,352,354,357,359,363,366,368],{"name":335,"start":336,"duration":337},"Brief: goal, audience & budget",0,5,{"name":154,"start":337,"duration":339},6,{"name":165,"start":341,"duration":293,"color":342},11,"#F44336",{"name":175,"start":344,"duration":345},14,8,{"name":185,"start":344,"duration":347},12,{"name":349,"start":350,"duration":351},"Shot list & call sheet",22,4,{"name":195,"start":353,"duration":293,"color":342},27,{"name":206,"start":355,"duration":356},30,9,{"name":216,"start":358,"duration":351,"color":342},39,{"name":360,"start":361,"duration":362},"Revisions, color & sound",43,7,{"name":364,"start":365,"duration":345},"Thumbnail, title & description",47,{"name":226,"start":367,"duration":293,"color":342},50,{"name":369,"start":329,"duration":327,"color":342},"Publish","O1RuEzBuLzt8y4m4xQ-zoKUM7phQv6wmqiFeMPskzho",[372,373,374,375,376],"de","es","fr","pt-br","zh-tw",1795617797266]