[{"data":1,"prerenderedAt":370},["ShallowReactive",2],{"doc:\u002Fgantt\u002Ftemplates\u002Fsoftware-development":3},{"doc":4,"missing":364},{"id":5,"title":6,"body":7,"category":290,"description":291,"extension":292,"locale":293,"meta":294,"navigation":295,"order":296,"path":297,"seo":298,"stem":312,"summary":313,"template":314,"__hash__":363},"ganttTemplates\u002Fgantt\u002Ftemplates\u002Fsoftware-development.md","Software Development Timeline Template (Free): From Requirements to Release",{"type":8,"value":9,"toc":278},"minimark",[10,15,19,22,25,29,36,42,48,52,80,84,105,109,112,220,223,227,230,233,236,239,242,262,265,268,272,275],[11,12,14],"h2",{"id":13},"about-this-template","About this template",[16,17,18],"p",{},"When you plan a software project, the release date is usually the first thing that gets decided, and often the only thing.",[16,20,21],{},"This template works backward from that date. It lays out requirements, design, three two-week sprints, QA, user acceptance testing and the release itself as an editable timeline, about twelve weeks from kickoff to release, so the product owner, the tech lead, the developers and QA can see who does what, and when.",[16,23,24],{},"Scale it to your project. A small feature set fits in two sprints. A larger one needs more sprints and a longer QA window.",[11,26,28],{"id":27},"how-the-plan-is-broken-down","How the plan is broken down",[16,30,31,35],{},[32,33,34],"strong",{},"Decide first."," Requirements end with an explicit sign-off, a task of its own. Design and environment setup start right after it. Building on requirements nobody signed off is how rework starts.",[16,37,38,41],{},[32,39,40],{},"Build in sprints, and write tests alongside."," Three sprints carry the build. The test plan and test cases are written during the first sprint, not after the last one, so QA can start the day the build is done.",[16,43,44,47],{},[32,45,46],{},"Verify, then ship."," Internal QA comes first, then UAT with real users. Bug fixes overlap UAT, release prep runs in parallel, and a go\u002Fno-go decision sits one day before the release.",[11,49,51],{"id":50},"why-the-durations-are-set-this-way","Why the durations are set this way",[53,54,55,62,68,74],"ul",{},[56,57,58,61],"li",{},[32,59,60],{},"Sign-off gets 3 days of its own."," \"Waiting for review\" is the most common hidden delay. Giving it a bar on the timeline makes it visible who is holding the work.",[56,63,64,67],{},[32,65,66],{},"Test cases are written during sprint 1."," They depend on the requirements and the design, not on finished code. Starting them late pushes QA late.",[56,69,70,73],{},[32,71,72],{},"QA and UAT are separate."," QA finds the bugs. UAT finds the \"that's not what we meant\". Merging them is how surprises reach production.",[56,75,76,79],{},[32,77,78],{},"Two weeks after the release."," The days after a release bring questions and fixes. Keep the team on the project instead of moving everyone to the next one.",[11,81,83],{"id":82},"common-pitfalls","Common pitfalls",[85,86,87,93,99],"ol",{},[56,88,89,92],{},[32,90,91],{},"Starting design before the scope is settled."," \"We'll decide as we build\" comes back during testing. Write down what is out of scope as well as what is in.",[56,94,95,98],{},[32,96,97],{},"Nobody is booked for UAT."," Agree at the start who will test and for how many days.",[56,100,101,104],{},[32,102,103],{},"No rollback plan."," Decide how to undo the release before you need to. It belongs in release prep.",[11,106,108],{"id":107},"who-finishes-what-before-the-next-step-starts","Who finishes what before the next step starts",[16,110,111],{},"Projects usually stall where nobody is sure whose turn it is. For each step, decide who finishes it and what \"done\" means before you start.",[113,114,115,131],"table",{},[116,117,118],"thead",{},[119,120,121,125,128],"tr",{},[122,123,124],"th",{},"Step",[122,126,127],{},"Who finishes it",[122,129,130],{},"Done when",[132,133,134,146,156,167,178,189,199,210],"tbody",{},[119,135,136,140,143],{},[137,138,139],"td",{},"Kickoff & requirements",[137,141,142],{},"Product owner",[137,144,145],{},"The scope and the user stories are written down and shared with the team",[119,147,148,151,153],{},[137,149,150],{},"Requirements sign-off",[137,152,142],{},[137,154,155],{},"Every change request is in, and \"we build this\" is decided",[119,157,158,161,164],{},[137,159,160],{},"Architecture & technical design",[137,162,163],{},"Tech lead",[137,165,166],{},"The design has been reviewed and the developers have agreed to it",[119,168,169,172,175],{},[137,170,171],{},"Each sprint",[137,173,174],{},"Developers",[137,176,177],{},"The sprint's stories work on the staging environment",[119,179,180,183,186],{},[137,181,182],{},"QA & regression testing",[137,184,185],{},"QA",[137,187,188],{},"Every test case has been run and the open bugs are listed",[119,190,191,194,196],{},[137,192,193],{},"User acceptance testing",[137,195,142],{},[137,197,198],{},"Real users have tried the main flows and said pass or fail",[119,200,201,204,207],{},[137,202,203],{},"Go\u002Fno-go decision",[137,205,206],{},"Product owner and tech lead",[137,208,209],{},"The open bugs have been reviewed and \"ship\" is decided",[119,211,212,215,217],{},[137,213,214],{},"Release",[137,216,174],{},[137,218,219],{},"It runs in production and users can start using it",[16,221,222],{},"If \"done\" is written as \"review\" or \"follow up\", nobody can say whether it happened. Write it as something that either happened or did not: \"shared\", \"decided\".",[11,224,226],{"id":225},"if-a-sprint-slips-by-3-days-does-the-release-date-hold","If a sprint slips by 3 days, does the release date hold",[16,228,229],{},"In this plan, the build and the tests form one path to the release:",[16,231,232],{},"Sprint 1 → Sprint 2 → Sprint 3 → QA → UAT → Go\u002Fno-go → Release",[16,234,235],{},"There are 3 days between the planned end of UAT (day 83) and the go\u002Fno-go decision (day 86). If a sprint runs 3 days long, QA starts on day 69 instead of day 66, and UAT ends on day 86 instead of day 83. The release date still holds on paper. But the 3 days were there to fix what UAT finds, and they are gone. A second slip moves the release.",[16,237,238],{},"Test cases and release prep are not on this path. They keep moving while a sprint runs long.",[16,240,241],{},"If the release date cannot move, win the time back in this order:",[85,243,244,250,256],{},[56,245,246,249],{},[32,247,248],{},"Cut scope from the last sprint."," Move stories to the next release. This shortens both the build and the testing, so it is the most effective step.",[56,251,252,255],{},[32,253,254],{},"Shorten UAT from 7 days to 5."," Book the testers in advance and agree on what they will check, and it can be done.",[56,257,258,261],{},[32,259,260],{},"Do not cut QA."," What you skip here is found in UAT or after the release. To save 3 days, you invite a longer rework.",[16,263,264],{},"If you cannot win it back, move the release and tell everyone the same day. Hearing about a delay at the last minute damages trust more than the delay itself.",[16,266,267],{},"To keep sprints from slipping, settle three things before you start: who decides what is in each sprint, when that decision is final, and what happens to work that does not fit.",[11,269,271],{"id":270},"how-to-use-it","How to use it",[16,273,274],{},"Enter your release date and click \"Start with this template\". The whole plan opens as an editable timeline (a Gantt chart), laid out backward from that date. No sign-up, no login. Drag and drop to match your team's pace.",[16,276,277],{},"The member list comes preloaded with a product owner, tech lead, developers and QA, so you can assign each step immediately. Share the plan with a link to keep the team and the stakeholders aligned on the schedule.",{"title":279,"searchDepth":280,"depth":281,"links":282},"",2,3,[283,284,285,286,287,288,289],{"id":13,"depth":280,"text":14},{"id":27,"depth":280,"text":28},{"id":50,"depth":280,"text":51},{"id":82,"depth":280,"text":83},{"id":107,"depth":280,"text":108},{"id":225,"depth":280,"text":226},{"id":270,"depth":280,"text":271},"software","A free software development timeline that runs from requirements and design through three sprints, QA, UAT and release. Enter your release date and the plan is laid out backward from it. No sign-up required.","md","en",{},true,80,"\u002Fgantt\u002Ftemplates\u002Fsoftware-development",{"persona":299,"target-query":300,"sub-queries":301,"avoid-queries":304,"vocabulary":307,"title":6,"description":291},"A product owner, tech lead or project manager who has a release date and needs a first draft of the whole schedule to share with the team and stakeholders","software development timeline template",[302,303],"software development plan template","software project plan template",[305,306],"software development life cycle","project management software",[308,309,310,311],"sprint","sign-off","UAT","go\u002Fno-go","gantt\u002Ftemplates\u002Fsoftware-development","A twelve-week development plan at a glance, laid out backward from your release date.",{"version":315,"name":316,"anchor-day":317,"date-label":318,"members":319,"tasks":320},1,"Software Development",87,"Release date",[142,163,174,185],[321,325,327,330,332,335,338,340,343,346,348,351,353,357,359,360],{"name":322,"start":323,"duration":324},"Kickoff & requirements (scope, user stories)",0,10,{"name":150,"start":324,"duration":281,"color":326},"#F44336",{"name":328,"start":324,"duration":329},"UX\u002FUI design",14,{"name":160,"start":331,"duration":324},13,{"name":333,"start":331,"duration":334},"Environments & CI setup",7,{"name":336,"start":337,"duration":329},"Test plan & test cases",24,{"name":339,"start":337,"duration":329},"Sprint 1",{"name":341,"start":342,"duration":329},"Sprint 2",38,{"name":344,"start":345,"duration":329},"Sprint 3",52,{"name":182,"start":347,"duration":324},66,{"name":349,"start":350,"duration":334,"color":326},"User acceptance testing (UAT)",76,{"name":352,"start":350,"duration":324},"Release prep (deploy plan, rollback, docs)",{"name":354,"start":355,"duration":356},"Bug fixes & retest",78,8,{"name":203,"start":358,"duration":315,"color":326},86,{"name":214,"start":317,"duration":315,"color":326},{"name":361,"start":362,"duration":329},"Post-release monitoring & fixes",88,"w0v9SF8gaFTFrwoljc-qQxBBt0q18DtHFG0FXl1OpRw",[365,366,367,368,369],"de","es","fr","pt-br","zh-tw",1795617797175]