[{"data":1,"prerenderedAt":439},["ShallowReactive",2],{"doc:\u002Fgantt\u002Ftemplates\u002Foffice-move":3},{"doc":4,"missing":432},{"id":5,"title":6,"body":7,"category":345,"description":346,"extension":347,"locale":348,"meta":349,"navigation":350,"order":351,"path":352,"seo":353,"stem":368,"summary":369,"template":370,"__hash__":431},"ganttTemplates\u002Fgantt\u002Ftemplates\u002Foffice-move.md","Office Move Timeline Template: Plan the Relocation Around Your Lease (Free)",{"type":8,"value":9,"toc":333},"minimark",[10,15,19,22,25,29,36,42,52,58,62,96,100,121,125,128,275,278,282,285,288,291,294,297,300,320,323,327,330],[11,12,14],"h2",{"id":13},"about-this-template","About this template",[16,17,18],"p",{},"An office move is a few months of work that nobody notices until something is missing on Monday morning: the internet, the phones, a desk, the right address on the invoices.",[16,20,21],{},"This template lays out a relocation as an editable timeline that works backward from move day, about six months from reading the current lease to handing the old office back. It assumes one office of a few dozen people moving into a space that needs some fit-out work. That is on the short side: many office move guides suggest starting six to twelve months ahead, and longer for a large space. A small move into a ready space can be shorter.",[16,23,24],{},"The durations are guidelines. The real dates come from your lease, your landlord, your contractor and your internet provider, so put theirs in as soon as you have them.",[11,26,28],{"id":27},"how-the-plan-is-broken-down","How the plan is broken down",[16,30,31,35],{},[32,33,34],"strong",{},"Start with the lease you already have."," Before choosing a move date, read the current lease: when it ends, whether there is a break clause, how much notice you have to give and how it has to be served, and what condition you have to leave the space in. Those terms decide how early everything else has to start. If the notice period is longer than this plan leaves between signing the new lease and the old lease ending, start the search earlier. This plan does not write those dates for you. Enter yours.",[16,37,38,41],{},[32,39,40],{},"Find and secure the space."," Write down how many people, how much space and how much money, then search. Check what internet service is actually available at each address before you sign, not after. Give notice on the current office only once the new lease is signed.",[16,43,44,47,48,51],{},[32,45,46],{},"Build the new space."," Floor plan, fit-out, furniture, and internet and phones. ",[32,49,50],{},"Internet service can take anywhere from a couple of weeks to months to install",", depending on whether fiber already reaches the building, so the order goes in as soon as the floor plan is settled. Phone number porting gets its own line: ask your provider whether your current numbers can move to the new address, because a number may not follow you to a different area.",[16,53,54,57],{},[32,55,56],{},"Move and close out."," Inventory and clear out, tell clients and vendors, set up and test the network before anyone arrives, pack, move, then restore the old office to the condition the lease asks for.",[11,59,61],{"id":60},"why-the-durations-are-set-this-way","Why the durations are set this way",[63,64,65,72,78,84,90],"ul",{},[66,67,68,71],"li",{},[32,69,70],{},"Five days to read the lease, marked red."," It sets the deadline for everything else.",[66,73,74,77],{},[32,75,76],{},"Internet and phones get 70 days."," Lead times vary by address and provider. Replace this with the date your provider commits to in writing.",[66,79,80,83],{},[32,81,82],{},"Fit-out gets 60 days."," Ask your contractor and landlord for their real schedule and use it.",[66,85,86,89],{},[32,87,88],{},"12 days to set up and test the network before move day."," People should arrive to working desks, not to an IT team still running cables.",[66,91,92,95],{},[32,93,94],{},"18 days to hand back the old office."," Removing your fit-out, repairs and cleaning, depending on what your lease requires.",[11,97,99],{"id":98},"common-pitfalls","Common pitfalls",[101,102,103,109,115],"ol",{},[66,104,105,108],{},[32,106,107],{},"Giving notice before the new lease is signed."," If the new deal falls through, you have nowhere to go.",[66,110,111,114],{},[32,112,113],{},"Cancelling the old internet too soon."," Keep the old service until the new one has been tested. Do not cancel the old phone service while a number port is still pending.",[66,116,117,120],{},[32,118,119],{},"Forgetting the old office."," Restoration can cost real money and time. Read what the lease requires before you budget the move.",[11,122,124],{"id":123},"who-finishes-what-before-the-next-step-starts","Who finishes what before the next step starts",[16,126,127],{},"An office move stalls where nobody knows whose decision it is. For each step, decide who finishes it and what \"done\" means before you start.",[129,130,131,147],"table",{},[132,133,134],"thead",{},[135,136,137,141,144],"tr",{},[138,139,140],"th",{},"Step",[138,142,143],{},"Who finishes it",[138,145,146],{},"Done when",[148,149,150,162,173,183,193,203,213,224,234,244,254,265],"tbody",{},[135,151,152,156,159],{},[153,154,155],"td",{},"Read the current lease",[153,157,158],{},"Move lead",[153,160,161],{},"The end date, the notice terms and the restoration terms are written down",[135,163,164,167,170],{},[153,165,166],{},"Requirements: headcount, space, budget",[153,168,169],{},"Leadership",[153,171,172],{},"The headcount, the space needed and the budget are approved",[135,174,175,178,180],{},[153,176,177],{},"Search for space & check internet",[153,179,158],{},[153,181,182],{},"There is a shortlist, and internet service is confirmed at each address",[135,184,185,188,190],{},[153,186,187],{},"Negotiate & sign the new lease",[153,189,169],{},[153,191,192],{},"The lease is signed",[135,194,195,198,200],{},[153,196,197],{},"Give notice on the current office",[153,199,158],{},[153,201,202],{},"Notice is served the way the lease requires",[135,204,205,208,210],{},[153,206,207],{},"Floor plan & fit-out design",[153,209,158],{},[153,211,212],{},"Leadership has approved the floor plan",[135,214,215,218,221],{},[153,216,217],{},"Order internet, phones & number porting",[153,219,220],{},"IT",[153,222,223],{},"The provider has confirmed an install date in writing",[135,225,226,229,231],{},[153,227,228],{},"Fit-out of the new space",[153,230,158],{},[153,232,233],{},"The contractor has finished and the walkthrough is booked",[135,235,236,239,241],{},[153,237,238],{},"Get quotes & book movers",[153,240,158],{},[153,242,243],{},"The movers are booked for move day",[135,245,246,249,251],{},[153,247,248],{},"Set up & test the network",[153,250,220],{},[153,252,253],{},"Every desk connects and the phones ring at the new numbers",[135,255,256,259,262],{},[153,257,258],{},"Move day",[153,260,261],{},"Movers",[153,263,264],{},"Everything on the inventory is in the new office",[135,266,267,270,272],{},[153,268,269],{},"Restore & hand back the old office",[153,271,158],{},[153,273,274],{},"The landlord has accepted the space back",[16,276,277],{},"If \"done\" is written as \"coordinate\" or \"look into\", nobody can say whether it happened. Write it as something that either happened or did not: \"signed\", \"booked\".",[11,279,281],{"id":280},"if-the-fit-out-runs-two-weeks-late-what-happens-to-move-day","If the fit-out runs two weeks late, what happens to move day",[16,283,284],{},"In this plan, a delay reaches move day along one path:",[16,286,287],{},"Sign the new lease → Floor plan & fit-out design → Fit-out → Walkthrough → Network setup & testing → Move day",[16,289,290],{},"The fit-out is planned from day 90 to day 150. Network testing ends on day 165, and move day is day 170, so there are 5 days of slack.",[16,292,293],{},"If the fit-out runs two weeks (14 days) late, it ends on day 164. The walkthrough runs to day 167, network testing to day 179, and move day moves from day 170 to day 179, 9 days later. If the old lease ends on a fixed date, those 9 days are the problem, and the 18 days for handing back the old office are squeezed too.",[16,295,296],{},"Furniture, movers and telling clients are not on this path. They can wait without moving move day, but the movers and the address change have to be rebooked if it moves.",[16,298,299],{},"If move day cannot move, win the time back in this order:",[101,301,302,308,314],{},[66,303,304,307],{},[32,305,306],{},"Ask the contractor to finish the network room first."," IT can start setting up there while the rest of the space is still being finished.",[66,309,310,313],{},[32,311,312],{},"Book the walkthrough in advance."," Settle the date with the landlord and contractor before the fit-out ends, so it does not wait on calendars.",[66,315,316,319],{},[32,317,318],{},"Do not skip the network test."," Moving people into an office without working internet costs more days than it saves.",[16,321,322],{},"If you cannot win it back, read what the current lease says about staying past the end date, ask the landlord early, and tell employees and the movers the new date the same day.",[11,324,326],{"id":325},"how-to-use-it","How to use it",[16,328,329],{},"Enter your move day and click \"Start with this template\". The whole plan opens as an editable timeline (a Gantt chart), laid out backward from that date. No sign-up, no login. Drag and drop to match the dates from your landlord, contractor and internet provider.",[16,331,332],{},"The member list comes preloaded with a move lead, leadership, IT and the movers, so you can assign each step right away. Share the plan with a link so everyone can see what is waiting on whom.",{"title":334,"searchDepth":335,"depth":336,"links":337},"",2,3,[338,339,340,341,342,343,344],{"id":13,"depth":335,"text":14},{"id":27,"depth":335,"text":28},{"id":60,"depth":335,"text":61},{"id":98,"depth":335,"text":99},{"id":123,"depth":335,"text":124},{"id":280,"depth":335,"text":281},{"id":325,"depth":335,"text":326},"business","A free office move timeline that works backward from move day: lease terms, requirements, the new space, internet and phones, fit-out, furniture, movers, telling people, packing, move day and handing back the old office. No sign-up required.","md","en",{},true,30,"\u002Fgantt\u002Ftemplates\u002Foffice-move",{"persona":354,"target-query":355,"sub-queries":356,"avoid-queries":360,"vocabulary":363,"title":6,"description":346},"An office manager or operations lead asked to run the company's office relocation, who needs one plan to show leadership, IT and the movers","office move timeline template",[357,358,359],"office relocation timeline","office move project plan template","office relocation schedule template",[361,362],"office move checklist template excel","office movers near me",[364,365,366,367],"lease","fit-out","number porting","move day","gantt\u002Ftemplates\u002Foffice-move","About six months of an office relocation at a glance, from the lease to the first week in the new space.",{"version":371,"name":372,"anchor-day":373,"date-label":258,"members":374,"tasks":375},1,"Office Move",170,[158,169,220,261],[376,381,383,386,389,391,393,395,398,401,405,407,410,414,417,421,424,425,429],{"name":377,"start":378,"duration":379,"color":380},"Read the current lease: end date, notice, restoration",0,5,"#F44336",{"name":166,"start":379,"duration":382},10,{"name":384,"start":385,"duration":351},"Search for space & check internet at each address",15,{"name":187,"start":387,"duration":388,"color":380},45,20,{"name":197,"start":390,"duration":336},65,{"name":392,"start":390,"duration":336},"Announce the move to employees",{"name":207,"start":390,"duration":394},25,{"name":217,"start":396,"duration":397},80,70,{"name":228,"start":399,"duration":400},90,60,{"name":402,"start":403,"duration":404},"Order furniture & equipment",95,55,{"name":238,"start":406,"duration":385},100,{"name":408,"start":409,"duration":394},"Inventory & clear out",130,{"name":411,"start":412,"duration":413},"Tell clients & vendors, update the address",135,35,{"name":415,"start":416,"duration":336},"Walkthrough & punch list",150,{"name":418,"start":419,"duration":420},"Set up & test the network in the new space",153,12,{"name":422,"start":423,"duration":382},"Pack & label",160,{"name":258,"start":373,"duration":335,"color":380},{"name":426,"start":427,"duration":428},"First week: fix what is missing",172,7,{"name":269,"start":427,"duration":430},18,"cykkwEmHRMKi1UhXQdm-z51QbE4XkLrNqGmGAVcvjTA",[433,434,435,436,437,438],"de","es","fr","pt-br","ja","zh-tw",1795617797034]