[{"data":1,"prerenderedAt":420},["ShallowReactive",2],{"doc:\u002Fgantt\u002Ftemplates\u002Fmarketing-campaign":3},{"doc":4,"missing":413},{"id":5,"title":6,"body":7,"category":334,"description":335,"extension":336,"locale":337,"meta":338,"navigation":339,"order":340,"path":341,"seo":342,"stem":356,"summary":357,"template":358,"__hash__":412},"ganttTemplates\u002Fgantt\u002Ftemplates\u002Fmarketing-campaign.md","A Marketing Campaign Timeline Example, from Brief to Results Report (Free Template)",{"type":8,"value":9,"toc":322},"minimark",[10,15,19,22,25,29,36,42,48,54,60,64,98,102,123,127,130,258,261,265,268,271,274,277,280,283,309,312,316,319],[11,12,14],"h2",{"id":13},"about-this-template","About this template",[16,17,18],"p",{},"A campaign has two dates that matter: the day it goes live and the day it ends. Everything before go-live is a chain of decisions and approvals, and everything after it is only worth the effort if you can measure what happened.",[16,20,21],{},"This template lays out one campaign as an editable timeline that starts from your go-live date: about seven weeks of preparation, four weeks live, and a week for the results report.",[16,23,24],{},"It assumes a campaign with a fixed run, such as a seasonal promotion or a lead generation push, using paid ads, email, social and a landing page. If you are shipping a new product or feature, the work around the release itself (release notes, support briefing) belongs in a product launch plan. This one is about getting a message in front of an audience and measuring the response. The durations are guidelines. If the campaign includes video or print, give production more time.",[11,26,28],{"id":27},"how-the-plan-is-broken-down","How the plan is broken down",[16,30,31,35],{},[32,33,34],"strong",{},"Decide what the campaign is for, then write it down."," Goal, audience and KPIs come first, then the budget and channels, then a creative brief that the approver signs off. Budget follows the goal, because how much to spend depends on what you are trying to get.",[16,37,38,41],{},[32,39,40],{},"Agree on the idea before anyone makes anything."," A big idea and key message, with its own sign-off. Changing the idea after the designs exist means redoing them.",[16,43,44,47],{},[32,45,46],{},"Produce, review, and set up measurement in parallel."," Copy, design and the landing page are built while tracking is set up. Brand and legal review gets its own slot, followed by one round of final revisions.",[16,49,50,53],{},[32,51,52],{},"Load everything, check it, then go live."," Ads are set up and submitted for platform review, email and social posts are scheduled, and a final check covers every link, tracking code and budget cap.",[16,55,56,59],{},[32,57,58],{},"Watch it while it runs, then write it up."," A weekly check during the run, and a results report after it ends.",[11,61,63],{"id":62},"why-the-durations-are-set-this-way","Why the durations are set this way",[65,66,67,74,80,86,92],"ul",{},[68,69,70,73],"li",{},[32,71,72],{},"Two sign-offs before production."," The brief and the concept are each approved on their own, so the approver does not see the idea for the first time in the finished design, when changes cost the most.",[68,75,76,79],{},[32,77,78],{},"Tracking starts before production ends."," UTM links and conversion events have to work from the first day. Visits and conversions from days when tracking was missing are hard to fill in afterward.",[68,81,82,85],{},[32,83,84],{},"Ad setup and platform review get 5 days."," Ad platforms review ads before they run. Google Ads says most ads are reviewed within one business day, more complex reviews can take longer, ads needed by a particular date should be submitted several days in advance, and changes to an ad restart the review (Google Ads Help, checked November 2026). That is why final revisions come before ad setup.",[68,87,88,91],{},[32,89,90],{},"2 days of slack before go-live."," The pre-launch check ends on day 47, and go-live is day 49.",[68,93,94,97],{},[32,95,96],{},"A week for the results report."," Some conversions arrive after the last ad runs. Google Ads, for example, credits a conversion to an ad click that happened within the conversion window, 30 days by default for Search and Display (Google Ads Help, checked November 2026). Check the window you set before closing the numbers.",[11,99,101],{"id":100},"common-pitfalls","Common pitfalls",[103,104,105,111,117],"ol",{},[68,106,107,110],{},[32,108,109],{},"No KPI agreed at the start."," If nobody wrote down what success means, the results report turns into an argument.",[68,112,113,116],{},[32,114,115],{},"The approver sees the work for the first time at the end."," Put the brief and the concept in front of them early, when changes are cheap.",[68,118,119,122],{},[32,120,121],{},"Tracking added after launch."," Test every link and conversion before go-live, not after the first report looks empty.",[11,124,126],{"id":125},"who-finishes-what-before-the-next-step-starts","Who finishes what before the next step starts",[16,128,129],{},"So that nobody has to ask whose turn it is, decide for each step who finishes it and what \"done\" means before you start.",[131,132,133,149],"table",{},[134,135,136],"thead",{},[137,138,139,143,146],"tr",{},[140,141,142],"th",{},"Step",[140,144,145],{},"Who finishes it",[140,147,148],{},"Done when",[150,151,152,164,175,186,196,207,218,228,238,248],"tbody",{},[137,153,154,158,161],{},[155,156,157],"td",{},"Goal, audience & KPIs",[155,159,160],{},"Campaign lead",[155,162,163],{},"The goal, the audience and the target numbers fit on one page",[137,165,166,169,172],{},[155,167,168],{},"Budget & channel plan",[155,170,171],{},"Campaign lead and paid media",[155,173,174],{},"The total budget and the split by channel are written down",[137,176,177,180,183],{},[155,178,179],{},"Brief sign-off",[155,181,182],{},"Approver",[155,184,185],{},"The brief is approved, with every change request already in it",[137,187,188,191,193],{},[155,189,190],{},"Concept sign-off",[155,192,182],{},[155,194,195],{},"One idea and one key message are chosen",[137,197,198,201,204],{},[155,199,200],{},"Copy & design production",[155,202,203],{},"Creative",[155,205,206],{},"Every asset in the channel plan exists in its final size and format",[137,208,209,212,215],{},[155,210,211],{},"Tracking setup",[155,213,214],{},"Paid media",[155,216,217],{},"Every link carries its UTM tags and a test conversion has been recorded",[137,219,220,223,225],{},[155,221,222],{},"Brand & legal review",[155,224,182],{},[155,226,227],{},"Every asset has been approved or returned with one list of changes",[137,229,230,233,235],{},[155,231,232],{},"Ad setup & platform review",[155,234,214],{},[155,236,237],{},"Every ad is approved by the platform and scheduled",[137,239,240,243,245],{},[155,241,242],{},"Pre-launch check",[155,244,160],{},[155,246,247],{},"Every link, tracking code and budget cap has been tested",[137,249,250,253,255],{},[155,251,252],{},"Results report",[155,254,160],{},[155,256,257],{},"The numbers against each KPI and three lessons are sent to the approver",[16,259,260],{},"If \"done\" is written as \"review\" or \"align\", nobody can say whether it happened. Write it as something that either happened or did not: \"approved\", \"sent\".",[11,262,264],{"id":263},"if-brand-and-legal-review-runs-3-days-late-what-happens-to-go-live","If brand and legal review runs 3 days late, what happens to go-live",[16,266,267],{},"In this plan, a delay reaches go-live along one path:",[16,269,270],{},"Brand & legal review → Final revisions → Ad setup & platform review → Pre-launch check → Go-live",[16,272,273],{},"The review runs from day 32 to day 36, final revisions from day 36 to day 39, ad setup from day 39 to day 44 and the pre-launch check from day 44 to day 47. Go-live is day 49, so there are 2 days of slack.",[16,275,276],{},"If the review runs 3 days late, final revisions end on day 42, ad setup on day 47 and the pre-launch check on day 50. That is one day past go-live.",[16,278,279],{},"The landing page, tracking setup and email and social scheduling are mostly off this path. They keep moving while the review runs long.",[16,281,282],{},"If go-live cannot move, win the time back in this order:",[103,284,285,291,297,303],{},[68,286,287,290],{},[32,288,289],{},"Send assets to review as they are finished, not all at once."," The first approved assets can go into ad setup while the rest are still in review.",[68,292,293,296],{},[32,294,295],{},"Submit ads for platform review early and keep them paused until go-live."," Google Ads reviews paused ads just like active ones (Google Ads Help, checked November 2026), so the review can finish before the start date.",[68,298,299,302],{},[32,300,301],{},"Go live on the channels that are ready."," Email and organic social can start on the date. Paid ads join a day or two later.",[68,304,305,308],{},[32,306,307],{},"Do not skip brand and legal review."," Let paid ads start late instead (step 3).",[16,310,311],{},"To keep the review from slipping, settle three things before you start: who approves, by when they answer, and how many rounds of changes are included.",[11,313,315],{"id":314},"how-to-use-it","How to use it",[16,317,318],{},"Enter your go-live date and click \"Start with this template\". The whole plan opens as an editable timeline (a Gantt chart), laid out backward from that date. No sign-up, no login. Drag and drop to match your own campaign, and stretch the weekly check if your campaign runs longer than four weeks.",[16,320,321],{},"The member list comes preloaded with a campaign lead, creative, paid media and an approver, so you can assign each step right away. Share the plan with a link so everyone sees the same dates on the way to go-live.",{"title":323,"searchDepth":324,"depth":325,"links":326},"",2,3,[327,328,329,330,331,332,333],{"id":13,"depth":324,"text":14},{"id":27,"depth":324,"text":28},{"id":62,"depth":324,"text":63},{"id":100,"depth":324,"text":101},{"id":125,"depth":324,"text":126},{"id":263,"depth":324,"text":264},{"id":314,"depth":324,"text":315},"business","A free marketing campaign timeline that works backward from your go-live date: goals and KPIs, the creative brief, budget and channels, concept, production, brand and legal review, tracking, ad review, the four-week run and the results report. No sign-up required.","md","en",{},true,32,"\u002Fgantt\u002Ftemplates\u002Fmarketing-campaign",{"persona":343,"target-query":344,"sub-queries":345,"avoid-queries":348,"vocabulary":351,"title":6,"description":335},"A marketer running a campaign with a fixed start and end, working with designers, a paid media person and someone who has to approve the work, who needs one timeline everyone can follow","marketing campaign timeline template",[346,347],"marketing campaign timeline example","marketing campaign schedule template",[349,350],"marketing campaign ideas","marketing campaign calendar template excel",[352,353,354,355],"creative brief","go-live","UTM","results report","gantt\u002Ftemplates\u002Fmarketing-campaign","Seven weeks of prep, four weeks live and a results report, laid out from the go-live date.",{"version":359,"name":360,"anchor-day":361,"date-label":362,"members":363,"tasks":364},1,"Marketing Campaign",49,"Go-live date",[160,203,214,182],[365,368,370,372,375,379,381,383,387,391,393,396,398,401,404,406,409],{"name":157,"start":366,"duration":367},0,5,{"name":168,"start":325,"duration":369},7,{"name":371,"start":367,"duration":367},"Creative brief",{"name":179,"start":373,"duration":324,"color":374},10,"#F44336",{"name":376,"start":377,"duration":378},"Big idea & key message",12,6,{"name":190,"start":380,"duration":324,"color":374},18,{"name":200,"start":382,"duration":377},20,{"name":384,"start":385,"duration":386},"Landing page build",22,14,{"name":388,"start":389,"duration":390},"Tracking setup (UTM links, conversions)",30,8,{"name":222,"start":340,"duration":392,"color":374},4,{"name":394,"start":395,"duration":325},"Final revisions",36,{"name":232,"start":397,"duration":367},39,{"name":399,"start":400,"duration":367},"Email & social scheduling",40,{"name":402,"start":403,"duration":325},"Pre-launch check (links, tracking, budgets)",44,{"name":405,"start":361,"duration":359,"color":374},"Go-live",{"name":407,"start":361,"duration":408},"Weekly check & optimization",28,{"name":410,"start":411,"duration":369},"Results report & lessons",77,"vXJxW6_j9sZUnzJPrm-beL_W22MAdi3oyMgDs09iDyI",[414,415,416,417,418,419],"de","es","fr","pt-br","ja","zh-tw",1795617797013]