[{"data":1,"prerenderedAt":373},["ShallowReactive",2],{"doc:\u002Fgantt\u002Ftemplates\u002Fhome-building":3},{"doc":4,"missing":367},{"id":5,"title":6,"body":7,"category":292,"description":293,"extension":294,"locale":295,"meta":296,"navigation":297,"order":298,"path":299,"seo":300,"stem":314,"summary":315,"template":316,"__hash__":366},"ganttTemplates\u002Fgantt\u002Ftemplates\u002Fhome-building.md","Home Building Timeline: Step by Step from Budget to Move-In (Free Template)",{"type":8,"value":9,"toc":280},"minimark",[10,15,19,22,25,29,36,46,52,56,84,88,109,113,116,222,225,229,232,235,238,241,244,247,267,270,274,277],[11,12,14],"h2",{"id":13},"about-this-template","About this template",[16,17,18],"p",{},"When you decide to build a home, you usually know when you want to move in. The year between now and then is harder to picture.",[16,20,21],{},"Building a home is a long run of large decisions: money, land, builder, design. Make them in the wrong order and later choices get narrower. This template lays the whole process out as an editable timeline that starts from the day you get the keys, about eleven months from the budget to move-in.",[16,23,24],{},"It assumes a custom home on a lot you still need to find. The durations are guidelines, and they vary widely with the builder, the region, the lot and the weather. If you already own the land, shorten the first part. Permits can take anywhere from a few weeks to several months depending on where you build, and construction runs much longer for a large or complex home. Ask your builder and lender what to expect where you are.",[11,26,28],{"id":27},"how-the-plan-is-broken-down","How the plan is broken down",[16,30,31,35],{},[32,33,34],"strong",{},"Set the conditions."," A budget ceiling and a pre-approval come first, then the builder and the lot. Without a ceiling, you cannot split the money between land and house.",[16,37,38,41,42,45],{},[32,39,40],{},"Decide the design."," Floor plan and selections, with the loan approval running alongside. ",[32,43,44],{},"Changes after the construction contract cost money and time,"," so decide before you sign.",[16,47,48,51],{},[32,49,50],{},"Build."," Foundation, framing, the systems inside the walls, then finishes, a final walkthrough and closing.",[11,53,55],{"id":54},"why-the-durations-are-set-this-way","Why the durations are set this way",[57,58,59,66,72,78],"ul",{},[60,61,62,65],"li",{},[32,63,64],{},"Design gets 60 days."," There are many decisions, and a household needs time to agree on them.",[60,67,68,71],{},[32,69,70],{},"Construction runs about five months."," Weather can stretch it. It is not a phase you can compress.",[60,73,74,77],{},[32,75,76],{},"5 days between the walkthrough and closing."," Room to fix what the walkthrough finds.",[60,79,80,83],{},[32,81,82],{},"Two weeks after closing."," For the move and for the things you only notice once you live there.",[11,85,87],{"id":86},"common-pitfalls","Common pitfalls",[89,90,91,97,103],"ol",{},[60,92,93,96],{},[32,94,95],{},"Touring model homes before setting a budget."," The more you see, the higher the ceiling drifts.",[60,98,99,102],{},[32,100,101],{},"Leaving meetings without decisions."," Ask for the full list of selections up front and put a date on each.",[60,104,105,108],{},[32,106,107],{},"Ending your lease too early."," If closing slips, you need somewhere to live. Leave a margin.",[11,110,112],{"id":111},"who-finishes-what-before-the-next-step-starts","Who finishes what before the next step starts",[16,114,115],{},"A build stalls where it is unclear who decides. For each step, decide who finishes it and what \"done\" means before you start.",[117,118,119,135],"table",{},[120,121,122],"thead",{},[123,124,125,129,132],"tr",{},[126,127,128],"th",{},"Step",[126,130,131],{},"Who finishes it",[126,133,134],{},"Done when",[136,137,138,150,160,170,180,191,202,212],"tbody",{},[123,139,140,144,147],{},[141,142,143],"td",{},"Budget & financing pre-approval",[141,145,146],{},"Homeowner",[141,148,149],{},"The ceiling is written down, split between land and house",[123,151,152,155,157],{},[141,153,154],{},"Find & buy the lot",[141,156,146],{},[141,158,159],{},"The lot is chosen and under contract",[123,161,162,165,167],{},[141,163,164],{},"Sign with the builder",[141,166,146],{},[141,168,169],{},"One builder is chosen and told",[123,171,172,175,177],{},[141,173,174],{},"Design: floor plan & selections",[141,176,146],{},[141,178,179],{},"Every selection on the list is made and shown on the plans",[123,181,182,185,188],{},[141,183,184],{},"Final loan approval",[141,186,187],{},"Lender",[141,189,190],{},"The decision has come back",[123,192,193,196,199],{},[141,194,195],{},"Construction contract & permits",[141,197,198],{},"Builder",[141,200,201],{},"The contract is signed and the permits are issued",[123,203,204,207,209],{},[141,205,206],{},"Construction",[141,208,198],{},[141,210,211],{},"The work is finished and the walkthrough is scheduled",[123,213,214,217,219],{},[141,215,216],{},"Final inspection & walkthrough",[141,218,146],{},[141,220,221],{},"The punch list is handed over with dates for the fixes",[16,223,224],{},"If \"done\" is written as \"think about\" or \"discuss\", nobody can say whether it happened. Write it as something that either happened or did not: \"chosen\", \"signed\".",[11,226,228],{"id":227},"if-design-decisions-run-long-what-happens-to-closing","If design decisions run long, what happens to closing",[16,230,231],{},"In this plan, a delay reaches closing along one path:",[16,233,234],{},"Design → Construction contract & permits → Foundation → Framing → Interior finishes → Final walkthrough → Closing",[16,236,237],{},"Design is planned from day 85 to day 145. The slack on this path is 15 days before interior finishes start and 5 days after the walkthrough, 20 days in total.",[16,239,240],{},"If design runs two weeks long, the slack absorbs it. If it runs a month long, closing moves by about 10 days. If your lease ends on a fixed date, that gap is yours to cover.",[16,242,243],{},"The loan approval runs alongside design, so it does not stop.",[16,245,246],{},"If closing cannot move, win the time back in this order:",[89,248,249,255,261],{},[60,250,251,254],{},[32,252,253],{},"Put the decisions in order."," Decide what affects structure and plumbing first. Paint colors and light fixtures can wait.",[60,256,257,260],{},[32,258,259],{},"Book the design meetings in advance."," A meeting that ends without the next date costs a week by itself.",[60,262,263,266],{},[32,264,265],{},"Do not squeeze construction."," Rushed work shows in the finish.",[16,268,269],{},"To keep design from running long, settle three things before you start: what gets decided by when, who in the household decides, and what wins when you cannot agree.",[11,271,273],{"id":272},"how-to-use-it","How to use it",[16,275,276],{},"Enter your closing date and click \"Start with this template\". The whole plan opens as an editable timeline (a Gantt chart), laid out backward from that date. No sign-up, no login. Drag and drop to match the dates your builder gives you.",[16,278,279],{},"Share the plan with your household by link, so everyone can see what needs deciding now.",{"title":281,"searchDepth":282,"depth":283,"links":284},"",2,3,[285,286,287,288,289,290,291],{"id":13,"depth":282,"text":14},{"id":27,"depth":282,"text":28},{"id":54,"depth":282,"text":55},{"id":86,"depth":282,"text":87},{"id":111,"depth":282,"text":112},{"id":227,"depth":282,"text":228},{"id":272,"depth":282,"text":273},"personal","A free home building timeline that works backward from the day you get the keys: budget and financing, the lot, the builder, design, permits, construction, the final walkthrough and move-in. No sign-up required.","md","en",{},true,28,"\u002Fgantt\u002Ftemplates\u002Fhome-building",{"persona":301,"target-query":302,"sub-queries":303,"avoid-queries":306,"vocabulary":309,"title":6,"description":293},"Someone building a custom home who knows when they want to move in but not what has to be decided by when","home building timeline",[304,305],"home building timeline step by step","house building timeline",[307,308],"cost to build a house","home builders near me",[310,311,312,313],"pre-approval","selections","framing","walkthrough","gantt\u002Ftemplates\u002Fhome-building","About eleven months of building a home at a glance, from the budget to the keys.",{"version":317,"name":318,"anchor-day":319,"date-label":320,"members":321,"tasks":323},1,"Home Building",330,"Closing date",[146,198,187,322],"Designer",[324,327,331,333,337,339,341,344,347,350,354,358,360,362],{"name":143,"start":325,"duration":326},0,20,{"name":328,"start":329,"duration":330},"Find a builder",10,45,{"name":154,"start":326,"duration":332},60,{"name":164,"start":334,"duration":335,"color":336},80,5,"#F44336",{"name":174,"start":338,"duration":332},85,{"name":184,"start":340,"duration":330},100,{"name":195,"start":342,"duration":343},145,30,{"name":345,"start":346,"duration":343},"Site prep & foundation",175,{"name":348,"start":349,"duration":330},"Framing, roof & exterior",205,{"name":351,"start":352,"duration":353},"Plumbing, electrical & HVAC",240,25,{"name":355,"start":356,"duration":357},"Interior finishes",265,50,{"name":216,"start":359,"duration":329,"color":336},315,{"name":361,"start":319,"duration":317,"color":336},"Closing & keys",{"name":363,"start":364,"duration":365},"Move in",331,14,"-I8_GYGPwH11E7NLWulzsOqxYvXDcJut2u_8n5lBOm8",[368,369,370,371,372],"de","es","fr","pt-br","zh-tw",1795617796982]